Sydney Opera House





I am fascinated by the Sydney opera house.I mean,it is an amazing looking building.Its younger than me,and I have had the opportunity to dance on its stage many times.I have also had the privilege of watching friends perform there as well.This time of the year I really think that the vivid festival wouldn't be as good,and as popular,if the opera house wasn't there.The sails all lite up are an amazing sight.







Heres some info from google about the Sydney Opera House.







History of the Design


The history surrounding the design and construction of the building became as controversial as its design. In 1956 the NSW Government called an open-ended international design competition and appointed an independent jury. The competition brief provided broad specifications to attract the best design talent in the world; it did not specify design parameters or set a cost limit. The main requirement of the competition brief was a design for two performance halls, one for opera and one for symphony concerts. Reputedly rescued from a pile of discarded submissions, Jørn Utzon’s winning entry created great community interest and the NSW Government’s decision to commission Utzon as the sole architect was unexpected, bold and visionary.


Construction


Design and construction were closely intertwined. Utzon’s radical approach to the construction of the building fostered an exceptional collaborative and innovative environment. The design solution and construction of the shell structure took eight years to complete and the development of the special ceramic tiles for the shells took over three years. The project was not helped by the changes to the brief. Construction of the shells was one of the most difficult engineering tasks ever to be attempted. The revolutionnary concept demanded equally revolutionary engineering and building techniques. Baulderstone Hornibrook (then Hornibrook Group) constructed the roof shells and the interior structure and fitout. At the behest of the Australian Broadcasting Commission (ABC) the NSW Government changed the proposed larger opera hall into the concert hall because at the time, symphony concerts, managed by the ABC, were more popular and drew larger audiences than opera.


Completion and Opening


Cost overruns contributed to populist criticism and a change of government resulted in 1966 to Utzon’s resignation, street demonstrations and professional controversy. Peter Hall supported by Lionel Todd and David Littlemore in conjunction with the then NSW Government Architect, Ted Farmer completed the glass walls and interiors including adding three previously unplanned venues underneath the Concert Hall on the western side.  Opened by Queen Elizabeth II in 1973, new works were undertaken between 1986 and 1988 to the land approach and Forecourt under the supervision of the then NSW Government Architect, Andrew Andersons, with contributions by Peter Hall.





Stage 2 nears completion